
All posts by DMA-MM
| Name: | Maritime Rescue Coordination Centre |
| Address: | Monkey Point Street Botataung Township Yangon |
| Telephone: | +95 1 202417 |
| Fax: | +95 1 202417 |
| Email: | mrcc.myanmar2012@gmail.com; mrcc.yangon@mptmail.com.mm |
Notice 1/2018
ကြေညာချက် (၁ ̸ ၂၀၁၈)
CoC နှင့် CoP All-in-One စာအုပ်များအား လက်ရှိတွင် (၁) ပတ်ချိန်းဆို ထုတ်ပေးခဲ့သော်လည်း နှစ်သစ်ကူး ရုံးပိတ်ရက်များ အတွင်း ကြန့်ကြာမှုများ မဖြစ်ပေါ်စေရေးအတွက် အောက်ပါရက်များအတိုင်း ထုတ်ပေးမည် ဖြစ် ပါကြောင်း အသိပေး ကြေညာအပ်ပါသည်။
| လျှော်လွှာတင်သည့်ရက် | ထုတ်ယူနိုင်မည့်ရက် |
|
05.04.2018 06.04.2018 |
12.04.2018 |
|
09.04.2018 10.04.2018 |
18.04.2018 |
|
11.04.2018 |
19.04.2018 |
|
12.04.2018 |
20.04.2018 |
SSE Division
MoU on Telemedical Maritime Advice Services
TMAS (Telemedical Maritime Advice Services) is one of the coastal State’s obligations that is required by: –
(1) SOLAS and SAR Conventions for “Search and Rescue Service”
(2) National SAR Plan
(3) MLC, 2006 – Regulation 4.1 – Medical care on board ship and ashore:
“Each Member shall ensure that seafarers on board ships in its territory who are in need of immediate medical care are given access to the Member’s medical facilities on shore.”
DMA, 3 April 2018
List of Service Provider for Port Reception Facility
Directive 5/2017 (Port Reception Facility)
| Type of waste and Convention reference | Service | Service provider |
| Oily residues (sludge) (MARPOL Annex I) | YES | 1. MECH COOL Engineering Co., Ltd.
2. Golden Dowa Eco-System Myanmar Co., Ltd. |
| Oily bilge water (MARPOL Annex I) | YES | 1. MECH COOL Engineering Co., Ltd.
2. Golden Dowa Eco-System Myanmar Co., Ltd. |
| Oily tank washings (slops) (MARPOL Annex I) | YES | 1. Golden Dowa Eco-System Myanmar Co., Ltd. |
| Dirty ballast water (MARPOL Annex I) | NO | N/A |
| Scale and sludge from tanker cleaning (MARPOL Annex I) | YES | 1. Golden Dowa Eco-System Myanmar Co., Ltd. |
| Oily mixtures containing chemicals (MARPOL Annex I) | YES | 1. Golden Dowa Eco-System Myanmar Co., Ltd. |
| Chemical/NLS (MARPOL Annex II) | YES | 1. Golden Dowa Eco-System Myanmar Co., Ltd. |
| Sewage (MARPOL Annex IV) | YES | 1. Golden Dowa Eco-System Myanmar Co., Ltd.
2. YCDC (Water and Sanitation) |
| Garbage (MARPOL Annex V) |
YES |
1. Golden Dowa Eco-System Myanmar Co., Ltd.
2. YCDC (Pollution Control & Cleaning Department) |
| Ozone-depleting substances (MARPOL Annex VI) | NO | N/A |
| Exhaust gas-cleaning residues (MARPOL Annex VI) | YES | 1. Golden Dowa Eco-System Myanmar Co., Ltd. |
| Ballast water (BWM Convention) | NO | N/A |
| Sediments (BWM Convention) | YES | 1. Golden Dowa Eco-System Myanmar Co., Ltd. |
Further more detail information: https://gisis.imo.org
IMO Member State Audit Scheme 26-2-2018 to 5-3-2018
The audit of Myanmar was undertaken from 24/2/2018 to 5/3/2018, by three auditors drawn from Cyprus, India and United States. The scope of the audit included the flag, coastal and port State obligations of Myanmar in relation to the applicable IMO instruments to which it is a Party.

The opening meeting was held at Yangon, Myanmar, on 26/2/2018. Those entities of the State that are involved in the implementation and enforcement of the provisions of the various mandatory IMO instruments and which were represented at the meeting were:

The closing meeting was held on 5/3/2018 at Yangon, Myanmar.

Members of the Audit Team
1. Georgios Demetriades (Team leader)
2. Aji Vasudevan (Team member)
3. George Leeford Boone (Team member)
Involved Officials from the Member State
1. Mr. Maung Maung Oo (Director General)
2. Mr. Thaung Kyaing (Deputy Director General)
3. Mr. Zaw Myint Thein (Adviser)
4. Mr. Thaw Ka (Adviser)
5. Mr. Ye Myint (Director)
6. Mr. Soe Naing I (Director)
7. Mr. Htay Lwin Oo (Director)
8. Mr. Ko Ko Naing (Director)
9. Mr. Aung Moe (Director)
10. Mr. Thant Zin Oo (Deputy Director)
11. Mr. Aung Kyaw Zan (Deputy Director)
12. Mr. Htay Aung (Assistant Director)
13. Dr. Theint Nandar Htet (Assistant Director)
14. Dr. Thiha Thwin (Assistant Director)
15. Dr. Swe Swe Aung (Deputy Director General)
16. Ms. Khin Cho Cho Shein (Director)
17. Mr. Han Win Aung (Assistant Director)
18. Mr. Aung Aung Lay (Deputy Director)
19. Mr. Thet Htay (Director Retd)
20. Mr. Maw Tun (IMO Retd)
21. Ms. Kyi Kyi Zaw (Assistant Director)
22. Lt.SG Soe Nyunt Thaw (Deputy Head)
23. Mr. Zaw Htut Aung (Chief Instructor)
24. Lt. Cdr Han Tun Aung (MRCC O/C)
25. Ms. Khin Aye Myint (Executive Engineer)
26. Mr. Aung Htike (Assistant Director)
27. Ms. Than Than Win (Assistant Director)
28. Mr. Aung Thein Win (Manager)
29. Mr. Win Ko Ko (Chief Engineer -Mech)
30. Mr. Aye Lwin (Inspector of Light house)
31. Mr. Wai Zun Aung (Chief Surveyors)
32. Mr. Aung Thet Naing (Translator)
33. Ms. Hnin Ei Wai (Translator)
Port State Control
PSC Inspection Statistics

|
SUMMARY |
|
| Total Inspection in 2013 | 2 |
| Total Inspection in 2014 | 4 |
| Total Inspection in 2015 | 6 |
| Total Inspection in 2016 | 5 |
| Total Inspection in 2017 | 26 |
Instruction
Pre-Arrival Notification
Every ship calling to any port of Myanmar shall submit a Pre-Arrival Notification (PAN) to the Designated Authority of the Republic of the Union of Myanmar through the e-mail: sse-dma@e-motc.gov.mm
MADE ISLAND OPERATION CENTRE (South East Asia Crude Oil Pipeline)
Phone : +959 444 34 825
E-mail : mmip@cnpc.com.cn